Brief Description: Aft top skin and skeleten work.
Tonight, I fabbed the F-707B angle clip and clecoed in the F-787 stiffener rib. Next, the F-7112 forward top skin was clecoed to the bulkhead. Lastly, I match drilled to all bulkheads, J stringers, and longerons.