KitLog pro

Powered By Kitlog Pro v2.0

Garys RV-7 Builders Log
' style=
Date:  1-30-2013
Number of Hours:  2.00
Manual Reference:  8-10
Brief Description:  Match drilled all remaining holes in fuselage.

Tonight I match drilled all remaining undrilled holes in the fuselage. I also drilled with a unibit the brake, fuel, and electrical passage holes to 7/16", 5/8", and 1" respectively as called out in the plans. These holes allow the utiities to pass from the wing into the fuselage.
' style=

Outside view of baggage area ribs drilled.

Outside view of baggage area ribs drilled.

' style=

Match drilling bottom skins.

Match drilling bottom skins.

' style=

More match drilling.....

More match drilling.....

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.