Brief Description: Match drilled F-902 forward bulkheads.
Today I started by match drilling the left F-684 gusset. I am close to the limits for edge distance for both of these gussets and plan to ask Gerry to stop by and take a look. Next, I deburred, fitted, and match drilled the F-902 forward bulkheads. I also drilled the two 5/8" rudder cable holes and riveted two nutplates to each F-902. I then clecoed both F-7101 gear attach webs in place and match drilled them to each F-902 bulkhead. The top and bottom tabs of the bulkheads were also drilled and clecoed.