Happy New Year! OK, enough of that. Today I installed both tanks on the spars. I torqued the AN3-4A bolts to 25 in-lbs on the spar to tank "Z" bracket connection. I ran out of these bolts and washers before completing the right wing tank so I will have to order more. I also installed all screws on the left tank to a snug tightness. I need to purchase an adapter to allow me to use my phillips tip on the torque wrench. The fit of the tanks to the spar and leading edge is almost perfect.