Powered By Kitlog Pro v2.0
WILLIAM'S WEB SITE
Super Trainer
All
5-3-2008
< Previous Log Entry
Next Log Entry >
Date:
5-3-2008
Number of Hours:
4.75
Manual Reference:
Brief Description:
Started cabin top section
Built jig for top section today. Cut and fit tubing for cabin top section , its ready for tack welding.
Although my brother and I both are building the wag-aero trainer we are changing our cabin section
and building both aircraft cabin and nose sections
like the PA-18 using the PA-18 drawings as a guide line. We both are using the 0-200
engine and wanted a stronger cage and nose section than the wag-plans show. We did not like
the three point wing mount and wanted a stronger cage. we Will be modifying our wings and
mounting them like the PA-18.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Super Trainer Home
Category
# Logs
# Hours
All
36
161
Fuselage
31
140
Landing Gear
1
7
Miscellaneous
2
6
tooling
2
8
Copyright © 2001-2024 Matronics. All Rights Reserved.