KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-11-2006
Number of Hours:  200.00
Manual Reference:  Fuselage Weldment
Brief Description:  Fuselage Welded and Primed

The fuselage was built using Tig method. This is the long fuselage design built for spring gear. It has a Van’s RV tail wheel now but I my change to a locking. My first Pitts is locking and there are pros and cons to both designs. The metal was primed as it was built to keep rust from forming. I am now going back over the frame and preparing for final epoxy coat.
' style=

Front Right

Front Right

' style=

Front Left

Front Left

' style=

Back Right

Back Right

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.