KitLog pro

Powered By Kitlog Pro v2.0

N618KM
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-12-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  RH elevator trailing edge setup and drilling

Finally got around to beginning the trailing edge work on the RH elevator. As for the rudder, had to buy some aluminum angle to maintain straightness as I match drilled from the top side holes thru the AEX wedge, the bottom side (which has no holes) and through the angle. Wasn't as tricky as I had feared (and procrastinated over!). Made that little drill guide in the drawing from a paint stirring stick. Tedious but satisfying to have done. Let's see. I only have to do this same procedure for 5 more control surfaces! All right!.
' style=

Drilling

Drilling

' style=

Clecos

Clecos

' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.