KitLog pro

Powered By Kitlog Pro v2.0

Mikes Web Site
' style=
Date:  5-12-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Prepping wings for primer

I fitted the LED navigation/strobe light combo to the wing tips. LED's have sure changed the world, the elecrical loads are almost none existent. Very nice, allowing me to use the 20amp teacup direct drive alternator on my engine, a very sleek and light accessory.

The wings have been washed, degreased, acid etched, and scuffed with a red scotch brite.... ready to be primed. Because it's best to prime within 24 hours of etching, you have to find basically two days together in your schedule... which has been a challenge this year.
' style=

fitting nav/strobe

fitting nav/strobe

' style=

Washed and Etched

Washed and Etched

' style=

Scuffed and drying

Scuffed and drying

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.