KitLog pro

Powered By Kitlog Pro v2.0

Michael's Sonex Project
' style=
Date:  9-10-2006
Number of Hours:  5.00
Manual Reference:  SNX-F02
Brief Description:  Wing Rigging Day 1

A lot of work was done today. First, three pins were made from 1/4" steel rods. One end was ground down to a taper and the other was bent 90 degrees, 4 inched in to form a handle. The fuselage was moved outside, placed on saw horses and leveled. The wings were removed from their storage perch in the rafters of a storage shed. The wings were installed and the three steel pins were installed. A lot of lifting, pushing, and pulling was needed to get the pins in, put they finally were installed.
' style=

Fuselage moved outside and leveled

Fuselage moved outside and leveled

' style=

Wings installed and Pins Installed

Wings installed and Pins Installed

' style=

Finished for the Day

Finished for the Day

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.