|
|
Michael's Sonex Project
|
Date: 7-15-2006
|
Number of Hours: 3.00
|
Manual Reference: SNX-F09
|
Brief Description: Installing parts for SNX-F09
|
|
The Gussets, SNX-F10-24, and Gusset Spacers, SNX-F10-25, were located, drilled and cleco'd. The Cap Assembly, SNX-F10-02 was located, drilled and cleco'd. The Left and Right channel Assembly, SNX-F10-09R/L, were located, drilled, and cleco'd. Finally the Center Support Channel, SNX-F10-12, was located, drilled and cleco'd.
|
|
Parts clamped in ready for drilling
|
|
More clamping of Parts
|
|
Parts Drilled and cleco'd
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |