Installed the DB-9 for the GRT EIS-6000 output. Routed Trim cable with Adel clamps and cable ties. Installed the Air hose to side vents and clamped in place. Made Coax for ELT and routed and installed Coax. Did final insatall of Remote ELT panel. Installed a Auxillary Power port on rear shelf above baggage area. Added final labels to the fuse panels and made measurements for hte side panels and baggage bag.