KitLog pro

Powered By Kitlog Pro v2.0

Michael's Sonex Project
' style=
Date:  1-29-2008
Number of Hours:  1.50
Manual Reference:  SNX-P13
Brief Description:  Drilling Left Cowl

The left cowl was placed on the fuselage and correctly positioned. Tape was used to hole the cowl have in place. The front was secured to the prop hub spacer. The side and bottom hinge halves were drilled and cleco'd in place. The two cowl halves were removed and slots were cut so that the hinge pins can be removed.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.