Brief Description: Root Rib Installation on Right Wing
The two root rib reinforcement brackets that were made incorrectly were re-made according the plans and deburred. Then the root ribs, front and aft, were place according to the plans. They were clamped, drilled and cleco'd in place. The ribs were removed one at a time and deburred. The mating surfaces were primed with Zinc Oxide. They were then re-installed and cleco'd.