Brief Description: Finishing up Main Spar Box and Aft Spar Carry Thro
The remaining bolts in the spar box through the main gear weld mounts were installed and torqued. I had to place another order with Wicks to order the bolt through the rear most support of the main gear weld mount. This was not included in any kits from Wicks. Oh Well! Moved on to installing the rear spar carry through assembly. This was mostly assembled outside the fuselage then placed into the fuselage and the final rivets were installed. The last piece to be completed were the six solid rivets, three on each side, on the top of the spar box. These set using a rivet gun and bucking bar. The formed head was formed into a counter sink to form a flush rivet.