A lot of work was done today. First, three pins were made from 1/4" steel rods. One end was ground down to a taper and the other was bent 90 degrees, 4 inched in to form a handle. The fuselage was moved outside, placed on saw horses and leveled. The wings were removed from their storage perch in the rafters of a storage shed. The wings were installed and the three steel pins were installed. A lot of lifting, pushing, and pulling was needed to get the pins in, put they finally were installed.