After deburring the upper firewal assembly the holes were dimpled. The assembly was put back together with clecos and then riveted with flush rivets. The SouthCo fasteners were installed with SSC-32 Flush rivets. Next a few remaining holes were drilled in the lower firewall. The top and bottom edges were bent up according to the plans (30 degrees and 60 degrees).