|
|
Michael's Sonex Project
|
Date: 5-7-2006
|
Number of Hours: 4.00
|
Manual Reference: SNX-F16
|
Brief Description: Cleaning up SNX-F16 Parts and building Assemblies
|
|
The Lower Forward Cross Tie,SNX-F16-10, was Filed to final size. Two (right and left) Vertical Angles, SNX-F16-06R/L, were filed to final size. The Support Angle, SNX-F16-04, was filed to final size. The Aft Tunnel Web Assembly, SNX-F16-03 was clamped up and drilled. The parts were dis-assembled and deburred. The Aft Tunnel Angle, SNX-F16-05, was dimpled. The Vertical Angles, SNX-F16-06R/L, and Support Angle, SNX-F16-04, was countersunk. The part was re-assembled to check fit.
|
|
Front Side of Web Assembliy, SNX-F16-03
|
|
Back Side of Web Assembliy, SNX-F16-03
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |