Powered By Kitlog Pro v2.0
Brents Panther Project
Panther LS
All
10-19-2015
< Previous Log Entry
Next Log Entry >
Date:
10-19-2015
Number of Hours:
2.00
Manual Reference:
Brief Description:
CANOPY BUILD
Received canopy drawing today :) Thanks Dan and Rachel
Started be twisting the front part of canopy rails to 8.3 deg. Per drawing, This makes the rail frame follow fuselage lines.
Next drilled P4505 angle brakets and hinge to rails and front bow on both sides.
Canopy Frame Rails
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Panther LS Home
Category
# Logs
# Hours
All
214
953
Avionics
13
73
Canopy
14
57
Empennage
14
66
Engine
27
116
Fuel Tanks
11
50
Fuselage
55
242
Miscellaneous
17
41
Painting
20
81
Spar
3
17
Wings
40
210
Copyright © 2001-2024 Matronics. All Rights Reserved.