KitLog pro

Powered By Kitlog Pro v2.0

Bill's RV-10 Builder Page
' style=
Date:  10-27-2008
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Building left hand panel

Started to lay out LH panel. Centered GRT in front of stick and pilot, centered back-up 4 pack under GRT.

I'm planning to lay out 12 evenly spaced switches probably centered under GRT screen. I'll actually install 9 (8 shown) in 3 or 4 groups using blank, uncut switch locations as separators. Trying to impose some geometric order and symmetry.
' style=

laying out switches

laying out switches

' style=

all the lines are continous, not dashed (?)

all the lines are continous, not dashed (?)

' style=

GRT centered over 4-pack over switches

GRT centered over 4-pack over switches

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.