KitLog pro

Powered By Kitlog Pro v2.0

Bill's RV-10 Builder Page
' style=
Date:  7-4-2007
Number of Hours:  7.00
Manual Reference:  25-1 - 25- 8
Brief Description:  Deconstructed QB Fuse and inspected work

Deconstructed QB Fuse and inspected work
Removed Baggage floor, rear seat pan, side panels, and front seat pan. This allowed inspection of QB fuselage - all steps in section 25-1 thru 25.8.

Did not remove reart and front seat floors (yet). Apparently there is a lot of variance in what has been completed in QB fuse since it was first available. I found all many steps completed satisfactorily where others found them undone or done poorly. For example, the firewall appears to be Pro-sealed on all edges and the main gear fitting appear to be fully installed with all bolts. No scrap or cleacos have been found in enclosed panels

At this point, I'm going to carefully go thru each step in manual to determine whether more needs to be removed. Removing top of forward fuselage remains to be done.
' style=

LH baggage floor and rear seat pan removed

LH baggage floor and rear seat pan removed

' style=

LH side panels removed

LH side panels removed

' style=

View of LH front seat pan removed, RH still in place

View of LH front seat pan removed, RH still in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.