KitLog pro

Powered By Kitlog Pro v2.0

Bill's RV-10 Builder Page
' style=
Date:  9-26-2008
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Installed heat controls

Wanted to get this mounted independent of avionics panel because it has to be threaded from the knob thru any holes to the heat boxes.

I plan to rebuild the heat boxes and replace aluminum door flap with stainless and the aluminum hinges with steel hinge leftover from main gear struts
' style=

fabricated bracket and face plate

fabricated bracket and face plate

' style=

Mounted on tunnel...

Mounted on tunnel...

' style=

Beneath Throttle quadrant

Beneath Throttle quadrant

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.