Powered By Kitlog Pro v2.0
Barracuda
Barracuda
Fuselage
4-26-2010
< Previous Log Entry
Next Log Entry >
Date:
4-26-2010
Number of Hours:
2.00
Manual Reference:
setting hinges
Brief Description:
locating hinge and bow position
locate hinge positions on upper bows . Cut and match hinge point blocks and glue in place with T-88. Hinge bases still need trimmed to the bows.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Barracuda Home
Category
# Logs
# Hours
All
626
1856
Ailerons
39
114
Center section
138
477
Empennage
81
242
Fuselage
184
529
Hardware
6
12
Landing Gear
44
158
Metal Block 1
15
15
Metal Block 1 - open
2
Metal Block 2
12
13
Metal Block 2 open i
4
Metal Block 3
5
13
Miscellaneous
9
1
Tech councilor / ins
4
10
wing outer panels
83
272
Copyright © 2001-2024 Matronics. All Rights Reserved.