KitLog pro

Powered By Kitlog Pro v2.0

Barracuda
' style=
Date:  4-18-2010
Number of Hours:  2.00
Manual Reference:  Instrument pnl rod
Brief Description:  Instrument panel and fwd structure

Permanent install of instrument panel rod and instrument panel bow. Weather proofed area , set the panel in a bed of dry micro , and seated with AN3-12 , wood washer and metal locknuts.

Permanent install of instrument panel bow . Set the panel bow permenantly at 9.5 inches , bedded the bow bottoms onto the longeron and angle with dry micro and seated with -19 flush bolt washer and lock nut.

Glued in firewall horizontal - top ripped at 5 degrees . T-88
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.