KitLog pro

Powered By Kitlog Pro v2.0

Barracuda
' style=
Date:  5-18-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  main pivot point landing gear

located and set main pivot points . Reamed through all with 1/4 reamer and fastened with NAS shear bolts per call out . The main pivot bolt AN8 -30 - needed to have the material removed from the head to prevent it from crushing the main spar shear web - to thick needed to be under 1/4 " or less than the thickness of the straps the casting bolts too . Nuts in picture are for temp use only AN castles and pins to be applied on final installation.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.