KitLog pro

Powered By Kitlog Pro v2.0

Barracuda
' style=
Date:  8-5-2007
Number of Hours:  3.00
Manual Reference:  sht 602
Brief Description:  Stab hardware permenant install

Final Install all stab hardware . All hardware was installed with a small amount of black silicone sealant at each bolt location . Installed floating nut plates on elevator inboard ribs to accept elevator horn . Applied thread lock to the small stainless steel bolts that hold the nut plates.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.