KitLog pro

Powered By Kitlog Pro v2.0

Barracuda
' style=
Date:  7-22-2007
Number of Hours:  4.00
Manual Reference:  Sht 602
Brief Description:  Stab lower skins glued in place

Glued both skins in place . Tac strips worked well. Still needed to clamp the leadind edge to bring the ply down on the very front of the leading edge. Since this reguired all the medium clamps I have on hand I had to glue the skins one at a time . The work preformed ( actual work ) was approximately 4 hours hands on - the time between sets was 10 hours.
' style=

skins applied

skins applied

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.