8-16-2011
< Previous Log Entry
Next Log Entry >
Date:
8-16-2011
Number of Hours:
10.00
Manual Reference:
Brief Description:
elevators
dupont epoxy hi fil sanding primer was applied , blocked filled , primed blocked filled and on and on until the surfaces were true for both sides.
Ten both were mounted and checked for deflection requirements and clearances.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Barracuda Home
Category
# Logs
# Hours
All
626
1856
Ailerons
39
114
Center section
138
477
Empennage
81
242
Fuselage
184
529
Hardware
6
12
Landing Gear
44
158
Metal Block 1
15
15
Metal Block 1 - open
2
Metal Block 2
12
13
Metal Block 2 open i
4
Metal Block 3
5
13
Miscellaneous
9
1
Tech councilor / ins
4
10
wing outer panels
83
272
Copyright © 2001-2024 Matronics. All Rights Reserved.