Added 4lbs 7oz of lead to back side of nose spar - equaly divided in four places between the nose ribs . T-88 with micro was used to hold the lead in place and counter sunk machine srews were used with large area washers and nyloc nuts- all saturated with t-88 to ensure permenant placement.
The balast provided a 11/4 inch nose low condition with the closing skin laid on the assembly.