Powered By Kitlog Pro v2.0
Barracuda
Barracuda
All
7-2-2011
< Previous Log Entry
Next Log Entry >
Date:
7-2-2011
Number of Hours:
2.00
Manual Reference:
Brief Description:
Final assemble and inspection at 234
Check and pushrod bearings and positions , Lock down lock nut both ends.
Apply high visability red laquer stripe across locking surfaces for later inspections .
Checked all hardware mounting nuts bolts and attachments are secure .
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Barracuda Home
Category
# Logs
# Hours
All
626
1856
Ailerons
39
114
Center section
138
477
Empennage
81
242
Fuselage
184
529
Hardware
6
12
Landing Gear
44
158
Metal Block 1
15
15
Metal Block 1 - open
2
Metal Block 2
12
13
Metal Block 2 open i
4
Metal Block 3
5
13
Miscellaneous
9
1
Tech councilor / ins
4
10
wing outer panels
83
272
Copyright © 2001-2024 Matronics. All Rights Reserved.