KitLog pro

Powered By Kitlog Pro v2.0

Barracuda
' style=
Date:  10-31-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Installing windsceen

left the shop heat up to 78 degrees over nite to make sure windscreen was warm . Sand fusealage surfaces . Clean all areas and windscreen with rubbing alchohol.

Double check everything , check again , dry run with my helper ( son adam ) .

Apply sika 226 cleaner to all bonding surfaces , wait 10 minutes , do it again .

Clean surfaces again with 226 cleaner - rag shows no sign of dirt - wait 10 minutes .

Apply sika 209D primer to all bonding surfaces . wait 25 minutes .

Apply Sika 295 UV heavy bead to bed windshield - used 2 1/3 tubes

set windsceen in place , wiggled jiggled settled into place , good squeeze out . Winscreen settled in nicely with little effort . Placed spacers just barely into sika around aft edge and clamped into place working center out from left /right , top to bottom . Double check lower seat - all is well .

Watch everything dry for 30 min - no change - no sika mess
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.