As per drawing 37 make pedal assembly. Make four pedals from supplied parts. Prep metal, debur, counter sink as needed for flush 426Ad rivets. Make two right and two left pedals. Drill mounting. Prime someparts not all. Thought about powdercoating pedals but will not. Make up mounting out of 2x4's to hold pedal weldments. Mount pedals to rudder pedal weldment. Mount dual brake master cylinders to top brackets. Check pedal placement use square and 3 ft. straight edge to get correct pedal alignment. Drill lower master cylinder mounting. Sit in chair and try to get the feeling for the pedals. Long day Put a fork in me I'm done.