KitLog pro

Powered By Kitlog Pro v2.0

MARV'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-10-2011
Number of Hours:  2.50
Manual Reference:  Drawing 34A
Brief Description:  Main landing Gear Mounts

Lined up and drilled the 7 mouning bolts along the side of the fuselage for the main landing gear mounts. This should be the final step in the mounts. Yes! Had to use slightly longer bolts in the mounting of the mounts to the main spar as the hardware calls out on the palns is wroong too short, no threads sticking through when tight. Called for AN4-12A used AN4-13A all is well. Five AN bolts washers and nuts along the side. Two counter sunk screws on the foward arm of the bracket andit is mounted.
' style=





' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.