KitLog pro

Powered By Kitlog Pro v2.0

Mark's Helicycle Build
' style=
Date:  6-6-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Cyclic Grip and Rotor Shaft Alignment Housing

Work was done to preliminarily install all collective and cyclic contols in the Helicycle. This is very detailed work with lots of measuring and remeasuring to make sure everything lines up. Initial work on the transmission group was started.
' style=

Cyclic grip prepped and painted

Cyclic grip prepped and painted

' style=

Attachment holes drilled for alignment housing

Attachment holes drilled for alignment housing

' style=

Alignment housing in place

Alignment housing in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.