Mark's Helicycle Build
Helicycle
Controls
6-6-2017
< Previous Log Entry
Next Log Entry >
Date:
6-6-2017
Number of Hours:
3.00
Manual Reference:
Brief Description:
Controls Construction
Work was done to preliminarily install all collective and cyclic contols in the Helicycle. This is very detailed work with lots of measuring and remeasuring to make sure everything lines up.
Holes drilled for wire ties
Holes drilled for locking control rod end blocks
Mixer assembly in place
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Helicycle Home
Category
# Logs
# Hours
All
68
266
Airframe
2
12
Controls
11
34
Delivery/Inventory
2
5
Engine
1
1
Fuel System
12
63
Fuselage
10
34
Instructional Videos
1
3
Landing Gear
4
11
Lubrication
3
7
Miscellaneous
2
None
1
Tail Rotor
5
24
Transmission
5
19
Trim Fins
5
30
Upholstery
2
9
Windscreen
2
14
Copyright © 2001-2024 Matronics. All Rights Reserved.