KitLog pro

Powered By Kitlog Pro v2.0

Mark's Helicycle Build
' style=
Date:  6-29-2017
Number of Hours:  8.00
Manual Reference:  
Brief Description:  jFuel tank brackets

Pretty much spent the whole day on designing and machining prototypes for the fuel tank brackets. Machining takes way too much time. I'm close to the correct design, but will 3D print the next batch of prototypes before machining out the final designs.
' style=

Original welded bracket. Too Heavy

Original welded bracket. Too Heavy

' style=

CNC machiined brackets

CNC machiined brackets

' style=

CNC machined brackets

CNC machined brackets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.