Powered By Kitlog Pro v2.0
Mark's Helicycle Build
Helicycle
All
6-24-2017
< Previous Log Entry
Next Log Entry >
Date:
6-24-2017
Number of Hours:
4.00
Manual Reference:
Brief Description:
Trim Fin Assembly
The trim fin corrosion proofing is dry and the final riveting of the fins to the vertical spar was done. It should be noted that the tubing was much easier to insert in to the bottom trim fin after the zinc chromate was applied.
Corrosion proofing done
Initial riveting of trim fins
Trim fins mostly riveted
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Helicycle Home
Category
# Logs
# Hours
All
68
266
Airframe
2
12
Controls
11
34
Delivery/Inventory
2
5
Engine
1
1
Fuel System
12
63
Fuselage
10
34
Instructional Videos
1
3
Landing Gear
4
11
Lubrication
3
7
Miscellaneous
2
None
1
Tail Rotor
5
24
Transmission
5
19
Trim Fins
5
30
Upholstery
2
9
Windscreen
2
14
Copyright © 2001-2024 Matronics. All Rights Reserved.