After removing primer from muffler tunnel riveted pieces together and riveted to fllor sides. Joined fire wall and floor assembly together sealed seams with fuel tank sealent and riveteted. Performed all task on pages 28-5 and 28-6 in one operation as per instructions on 3/23. Other work done between 3/6 and 3/22