KitLog pro

Powered By Kitlog Pro v2.0

Marks KitLog
' style=
Date:  4-3-2016
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Inital Solidworks Modeling of VP-1

This step completed before completion of "Kitlog" project file and so is not as detailed as future posts.

Solidworks of approximately 50% of the airplane was completed including:
-Bulkheads
-Rudder
-Stabilator
-Ailerons
-Spars
-Spar Brackets
-Landing Gear
-Fuselage (F-9) stiffener
-Tailwheel Frame
-Control Stick
-Fuel Tank Bottom
-Wing Ribs
-Seat Support
-Instrument Panel
-Fairlead
-Hinges
-Control Surface Weights
-Brackets
-Trim Tabs

Conceptual Design Planning Includes:
-Layout of instrument panel and cockpit (incorporating IPad Mini for Foreflight)
-Color scheme decisiong (Piper Cub Yellow with Stained wood Accent)
-Front windshield and turtle deck design decision
-Decison on what parts to begin construction (Fuselage Sides, Control Stick Assembly, Bulkheads)
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.