KitLog pro

Powered By Kitlog Pro v2.0

Marks Sling Project
< Previous Log Entry          Next Log Entry >
' style=
Date:  3-29-2012
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Factory visit

Went out to factory to collect a few missing bits. Have returned the Toe brake kit - Mike Blythe says the maintenance is less - brake pads etc. Saves 7.5K as well.
Spent an hour or so checking out the fuselage build being done and what fits where.

Discussed the access to drawing files with Terry at the factory. The manual will be available on Dropbox soon with- E Drawings.which will allow 3-d visualizations
The drawings are changing all the time and up to date info will be a welcome addition

Collect some more Primer and painted / primed the rest of the day!
The factory paints a strip of primer under the mating parts before joining. It looks a bit messy, but there have been some corrosion issues with planes at the coast
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.