KitLog pro

Powered By Kitlog Pro v2.0

Marks Sling Project
' style=
Date:  2-9-2012
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Inspection

Prepared for inspection,
Wet & dry paper on skins - might give the painting a go myself?? still undecided.

Garreth came from the Airplane company for an inspection before closing up skins.
He was very complimentary about my build! Go Garreth!!
A couple of rivets needed redoing.
The wire supplied with the strobe is 1 wire shy ! will have to use the shielding as a wire
Supports at rear spar are different - there are some notches to help with identification

There are a few drilled holes at the bellcrank inspection = ?? no idea what they are for.
' style=

Wiring for Strobe

Wiring for Strobe

' style=

Rear  skin supports

Rear skin supports

' style=

Mystery holes

Mystery holes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.