Installed the leading edges, ran the wires into the wing, Cleco'ed everything into place. I started to fit the rivets to the spar and realized I really needed an offset rivet shank to drive them properly so I ordered those. Death by 1000 little tools needed.
Getting really hot out. I am having to plan all my work around the outside temperature now. It's gonna be this way until October.