KitLog pro

Powered By Kitlog Pro v2.0

Marks RV8 Web Site
' style=
Date:  6-18-2023
Number of Hours:  3.50
Manual Reference:  8-54
Brief Description:  Attach HS

Leveled the fusleage sie to side and front to back. Attached the HS and centered and leveled. Drilled the holes in the HS spar to attach brakets. Had a harder time doing the front spar flange to desk holes but was able to reach them with a 12" drill bit. Used AN470-4-12 rivets I had to hold things into place. Then one by one drilled out the rivets and drilled #12 and replaced them with the appropriate bolts.

Will work on the vertical stab tomorrow. The heat index is 110-120 so I can work for about three hours in the AM before I have to quit.
' style=

Centered and level

Centered and level

' style=

Leveled at the back

Leveled at the back

' style=

Attached.

Attached.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.