KitLog pro

Powered By Kitlog Pro v2.0

Marks RV8 Web Site
' style=
Date:  12-12-2021
Number of Hours:  3.00
Manual Reference:  8-42/43
Brief Description:  Landing gear installation

Started by drilliing the 7/16" holes in the fuselage. Almost broke my wrist as the bit caught in the steel and I had the drill set without torque.

Drilled the main landing gear 7/16" bolt holes using a drill press. The manual recommends using Boelube but I find that kerosene works much better as a lubricant for drilling steel.
' style=

Right Leg

Right Leg

' style=

Left Leg

Left Leg

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.