Installed the inside gear weldments. Drilled out the bolt holes & fitted the hardware. Torqued to spec.
It appears that we will have two sets of holes to drill out as there are two holes on the blueprints that aren't on the piece. I'm guessing they will be drilled when the landing gear is installed.
Riveted the outboard weldments into place. I tried to use the offset shank for the rivets close to the edge but had a very hard time. I ordered a set of 5" long shanks to use. In the meanwhile I ended up drilling out about eight of the rivets.