Powered By Kitlog Pro v2.0
Marks RV8 Web Site
RV-8
All
3-4-2023
< Previous Log Entry
Next Log Entry >
Date:
3-4-2023
Number of Hours:
2.00
Manual Reference:
8-49
Brief Description:
Fuselage Floors
Fitted all the stiffeners to the main floor and match drilled. Fitted the rear seat hinge bottom and matched drilled. Used the C-frame to dimple both rear floors, the front floor, and the baggage floors for flush rivets.
Stiffeners Fitted
Dimples
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
628
1588
Empennage
93
202
Fuel Tanks
145
265
Fuselage
222
638
Miscellaneous
2
Shop
11
141
Wings
155
342
Copyright © 2001-2024 Matronics. All Rights Reserved.