Powered By Kitlog Pro v2.0
Marks RV8 Web Site
RV-8
All
3-5-2022
< Previous Log Entry
Next Log Entry >
Date:
3-5-2022
Number of Hours:
2.00
Manual Reference:
8-43
Brief Description:
Leveling Fuselage
Used bottle jacks to level the fuselage and installed 2x4's and shims on the saw horses to level everything.
Once the fuselage was leveled, installed the gear and support brackets and installed the 7/16th main bolt to hold the legs in place.
Harbor Freight Jacks
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
628
1588
Empennage
93
202
Fuel Tanks
145
265
Fuselage
222
638
Miscellaneous
2
Shop
11
141
Wings
155
342
Copyright © 2001-2024 Matronics. All Rights Reserved.