Powered By Kitlog Pro v2.0
Marks RV8 Web Site
RV-8
All
11-6-2021
< Previous Log Entry
Next Log Entry >
Date:
11-6-2021
Number of Hours:
4.00
Manual Reference:
8-38
Brief Description:
Aft Fuselage
No one could rivet, so I assembled the aft deck. Then assembled and riveted the rear seat belt anchors. Installed the anchors and torqued bolts.
Started assembly of the battery box for rear installation.
Aft Deck
Seat belt anchor
Battery box
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
628
1588
Empennage
93
202
Fuel Tanks
145
265
Fuselage
222
638
Miscellaneous
2
Shop
11
141
Wings
155
342
Copyright © 2001-2024 Matronics. All Rights Reserved.