Brief Description: Right Lower Longeron & Landing Gear Box Plates
Installed and drilled the lower right longeron. This one went way way faster and only required minimal tweaking to fit. Drilled and installed temporary bolts.
The deburred and fit the landing gear side box plates. They required some coxing to fit in place and I will look at re-fluting the l.g. boxes this evening.