KitLog pro

Powered By Kitlog Pro v2.0

Marks RV8 Web Site
' style=
Date:  5-19-2018
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Flap Brace

Riveted the flap brace into position.

Drilled out several holes to allow the pitot tubing to be routed. Found out I couldn't reach four of the holes. I had to order a 12" 3/8" drill bit to reach the tubing holes.

Installed the bushings where I was able.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.