Powered By Kitlog Pro v2.0
Marks RV8 Web Site
RV-8
All
5-19-2018
< Previous Log Entry
Next Log Entry >
Date:
5-19-2018
Number of Hours:
3.00
Manual Reference:
Brief Description:
Flap Brace
Riveted the flap brace into position.
Drilled out several holes to allow the pitot tubing to be routed. Found out I couldn't reach four of the holes. I had to order a 12" 3/8" drill bit to reach the tubing holes.
Installed the bushings where I was able.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
622
1568
Empennage
93
202
Fuel Tanks
145
265
Fuselage
216
618
Miscellaneous
2
Shop
11
141
Wings
155
342
Copyright © 2001-2024 Matronics. All Rights Reserved.