Powered By Kitlog Pro v2.0
Marks RV8 Web Site
RV-8
All
5-6-2016
< Previous Log Entry
Next Log Entry >
Date:
5-6-2016
Number of Hours:
3.00
Manual Reference:
Brief Description:
Fuel Tanks - Flanges and Drains
Riveted the two drain flanges into place. Riveted the two fuel drains into place. Drilled holes in the end ribs and attach brackets to allow the fuel elbows to connect to the flop tubes.
Awesome camera work
Drain
Flop tube hole
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
628
1588
Empennage
93
202
Fuel Tanks
145
265
Fuselage
222
638
Miscellaneous
2
Shop
11
141
Wings
155
342
Copyright © 2001-2024 Matronics. All Rights Reserved.